Permit requirements · Florida
Broward County, FL HVAC permit requirements
What the adopted code says, what the permit office actually collects, and where each answer comes from.
Adopted residential code
Florida Building Code 8th Edition (2023), including Residential, with Broward County amendments to Chapter 1. The BORA site links 'Municode – Florida Building Code, Chapter 1 (8th Edition)'.
SourceEnergy code
Florida Building Code, Energy Conservation, 8th Edition (2023). The county Building Code Division cites 'FEC R401.2', 'FEC403.7.1' and 'FEC R403.7.1.1'.
SourceLoad calculation (Manual J / S)
VariesCounty Building Code Division packet. For 'NEW A/C SYSTEM WITH DUCTS or MECHANICAL FIRE REPAIR': 'ACCA Manual J or Load Calculations – FEC403.7.1'. For 'A/C REPLACEMENT, CHANGEOUT', a load calculation is required only under BORA Policy 19-02, where the form says: '(*) Provide equipment sizing calculation if existing unit data is not available (ACCA Manual N, J, etc.)'. The mechanical-permit application info also asks for 'Three (3) sets of Energy Calculations and two (2) sets of Cooling Load Calculations.'
SourceDuct design (Manual D)
Not verifiedA new A/C system with ducts requires a 'Mechanical plan showing duct routing – FEC R403.1'. Manual D is not named.
SourceEquipment replacements (changeouts)
BORA Policy 19-02 (Effective 10/01/2019, Revised 07/02/2024), 'Broward County Uniform Data Form for Residential and Light Commercial Air Conditioning Replacements': 'Each system requires a form.' 'All others, including cooling towers, chillers, refrigeration units, etc., must provide plans.' It records existing and new unit data (manufacturer, tons, SEER/SEER2/EER, model numbers, strip heat, MCA, maximum overcurrent protection, disconnect size). Footnotes: '(*) Provide equipment sizing calculation if existing unit data is not available (ACCA Manual N, J, etc.)' and '(**) Provide AHRI Certificate'. It also asks about stand/curb, duct smoke detector, same location, flood replacement, and 'line side' electrical work. The July 2, 2024 BORA memo recommends an electrical plan review and inspection for line-side work under SB 612 / s. 489.105. The county Building Code Division's change-out list: Uniform Permit Application, the BORA 19-02 form, 'AHRI Certificate - FEC R403.7.1.1', and 'Signed and Sealed Anchoring Detail or NOA - FMC 301.15'.
SourceEnergy compliance paths
'Energy compliance report form R405 or R402 – FEC R401.2', required for a new A/C system with ducts.
SourceWhat the submittal asks for
Change-out: 'Current version of the Broward County Uniform Permit application(s)', the BORA Policy 19-02 Uniform Data form, 'AHRI Certificate - FEC R403.7.1.1', and 'Signed and Sealed Anchoring Detail or NOA - FMC 301.15'. New A/C system with ducts adds 'Mechanical plan showing duct routing – FEC R403.1', 'Energy compliance report form R405 or R402 – FEC R401.2' and 'ACCA Manual J or Load Calculations – FEC403.7.1'. A Notice of Commencement is required when an A/C repair or replacement is valued at $15,000 or more.
SourceUpcoming code changes
The statewide 9th Edition (2026) FBC is scheduled to take effect 12/31/2026 per the Commission workplan. No BORA 9th-Edition notice was found on the BORA page.
SourcePermit portal
Questions
Does Broward County, FL require a Manual J?
It depends on the project. County Building Code Division packet. For 'NEW A/C SYSTEM WITH DUCTS or MECHANICAL FIRE REPAIR': 'ACCA Manual J or Load Calculations – FEC403.7.1'. For 'A/C REPLACEMENT, CHANGEOUT', a load calculation is required only under BORA Policy 19-02, where the form says: '(*) Provide equipment sizing calculation if existing unit data is not available (ACCA Manual N, J, etc.)'. The mechanical-permit applic
What code does Broward County, FL use?
Florida Building Code 8th Edition (2023), including Residential, with Broward County amendments to Chapter 1. The BORA site links 'Municode – Florida Building Code, Chapter 1 (8th Edition)'.