Broward County, FL HVAC permit requirements

What the adopted code says, what the permit office actually collects, and where each answer comes from.

Manual J / SVaries
Manual DNot verified
Climate zone
Verified2026-09-18

Adopted residential code

Florida Building Code 8th Edition (2023), including Residential, with Broward County amendments to Chapter 1. The BORA site links 'Municode – Florida Building Code, Chapter 1 (8th Edition)'.

Source

Energy code

Florida Building Code, Energy Conservation, 8th Edition (2023). The county Building Code Division cites 'FEC R401.2', 'FEC403.7.1' and 'FEC R403.7.1.1'.

Source

Load calculation (Manual J / S)

Varies

County Building Code Division packet. For 'NEW A/C SYSTEM WITH DUCTS or MECHANICAL FIRE REPAIR': 'ACCA Manual J or Load Calculations – FEC403.7.1'. For 'A/C REPLACEMENT, CHANGEOUT', a load calculation is required only under BORA Policy 19-02, where the form says: '(*) Provide equipment sizing calculation if existing unit data is not available (ACCA Manual N, J, etc.)'. The mechanical-permit application info also asks for 'Three (3) sets of Energy Calculations and two (2) sets of Cooling Load Calculations.'

Source

Duct design (Manual D)

Not verified

A new A/C system with ducts requires a 'Mechanical plan showing duct routing – FEC R403.1'. Manual D is not named.

Source

Equipment replacements (changeouts)

BORA Policy 19-02 (Effective 10/01/2019, Revised 07/02/2024), 'Broward County Uniform Data Form for Residential and Light Commercial Air Conditioning Replacements': 'Each system requires a form.' 'All others, including cooling towers, chillers, refrigeration units, etc., must provide plans.' It records existing and new unit data (manufacturer, tons, SEER/SEER2/EER, model numbers, strip heat, MCA, maximum overcurrent protection, disconnect size). Footnotes: '(*) Provide equipment sizing calculation if existing unit data is not available (ACCA Manual N, J, etc.)' and '(**) Provide AHRI Certificate'. It also asks about stand/curb, duct smoke detector, same location, flood replacement, and 'line side' electrical work. The July 2, 2024 BORA memo recommends an electrical plan review and inspection for line-side work under SB 612 / s. 489.105. The county Building Code Division's change-out list: Uniform Permit Application, the BORA 19-02 form, 'AHRI Certificate - FEC R403.7.1.1', and 'Signed and Sealed Anchoring Detail or NOA - FMC 301.15'.

Source

Energy compliance paths

'Energy compliance report form R405 or R402 – FEC R401.2', required for a new A/C system with ducts.

Source

What the submittal asks for

Change-out: 'Current version of the Broward County Uniform Permit application(s)', the BORA Policy 19-02 Uniform Data form, 'AHRI Certificate - FEC R403.7.1.1', and 'Signed and Sealed Anchoring Detail or NOA - FMC 301.15'. New A/C system with ducts adds 'Mechanical plan showing duct routing – FEC R403.1', 'Energy compliance report form R405 or R402 – FEC R401.2' and 'ACCA Manual J or Load Calculations – FEC403.7.1'. A Notice of Commencement is required when an A/C repair or replacement is valued at $15,000 or more.

Source

Upcoming code changes

The statewide 9th Edition (2026) FBC is scheduled to take effect 12/31/2026 per the Commission workplan. No BORA 9th-Edition notice was found on the BORA page.

Source
Verified against official sources on 2026-09-18. Codes and local policies change, so confirm with the building department before you submit. Send us the address and we will check it for you.

Questions

Does Broward County, FL require a Manual J?

It depends on the project. County Building Code Division packet. For 'NEW A/C SYSTEM WITH DUCTS or MECHANICAL FIRE REPAIR': 'ACCA Manual J or Load Calculations – FEC403.7.1'. For 'A/C REPLACEMENT, CHANGEOUT', a load calculation is required only under BORA Policy 19-02, where the form says: '(*) Provide equipment sizing calculation if existing unit data is not available (ACCA Manual N, J, etc.)'. The mechanical-permit applic

What code does Broward County, FL use?

Florida Building Code 8th Edition (2023), including Residential, with Broward County amendments to Chapter 1. The BORA site links 'Municode – Florida Building Code, Chapter 1 (8th Edition)'.

Same-day quotes

Drop the plans. Get a quote today.

Drop in the plan set and pick your services. A designer replies with price and turnaround, usually within 30 minutes during business hours.

Fast quote

Drop your plans. Get a quote.

PDF or photos of the plan set. Pick your services and send. A designer replies with price and turnaround.

    Services
    Price$0

      A designer reviews every plan set and replies with price and turnaround, usually within 30 minutes during business hours. Nothing is charged until you approve.