Light-commercial load calculations
Manual N for light-commercial projects.
Offices, shops, restaurants, churches and tenant build-outs carry loads a house never sees: occupancy, ventilation air, lighting, kitchens and equipment. Manual N accounts for all of it.
What it is
ACCA Manual N is the load calculation procedure for light-commercial buildings. It includes internal gains from people, lighting and equipment, outdoor ventilation air, and schedules of use.
We pair it with ACCA Manual Q duct design and VRF design when the project calls for them.
When you need it
Commercial mechanical permits generally require a load calculation to justify equipment size, and energy code compliance on the same project often depends on it.
What we need from you
- Architectural plans
- Use and occupancy for each space
- Hours of operation
- Kitchen, server or process equipment lists
What you receive
- Zone and block loads
- Ventilation assumptions stated plainly
- Equipment sizing support for the mechanical plan
“We here at TRG HVAC LLC have been using LoadCalcs for years now. Scott, Jake and Amy are absolute professionals. The turn around time for results are impeccable. I highly recommend the services offered by Loadcalcs! Thank you again for your help.”
Questions
Do you handle tenant improvements?
Yes. Build-outs inside existing shells are a large share of light-commercial work.
Can you design the ductwork too?
Yes. Commercial duct design follows ACCA Manual Q, and we can include it.
Do you stamp commercial drawings?
We are ACCA-certified designers, not a PE firm. If your jurisdiction requires a sealed mechanical plan, tell us up front and we will coordinate with your engineer of record.
Same-day quotes
Drop the plans. Get a quote today.
Drop in the plan set and pick your services. A designer replies with price and turnaround, usually within 30 minutes during business hours.