The fastest projects we deliver are not the simplest ones. They are the ones where everything arrived in the first email. A Manual J on a 3,900-square-foot new build went back to one contractor within a day because the questionnaire was complete.
Send this with your first email
- A dimensioned floor plan as a PDF
- Elevations and a wall section, if available
- Window sizes and types, or a window schedule
- Insulation values for walls, ceiling and floor
- The project address
- The equipment type you plan to use, and any brand preference
- What your building department asked for, or its comment letter if the permit was rejected
What slows things down
- Plans without dimensions
- Unknown window specs on a glass-heavy design
- Changing equipment after Manual S is done
- Finding out late that the jurisdiction also wants an energy report
When it is truly urgent
Call. We have turned around weekend requests for Monday permit appointments, and rush service is available. Tell us the deadline up front and we will tell you honestly whether we can make it.