Nashville-Davidson, TN HVAC permit requirements

What the adopted code says, what the permit office actually collects, and where each answer comes from.

Manual J / SRequired
Manual DRequired
Climate zone
Verified2026-09-18

Adopted residential code

2024 IRC with Metro amendments, BL2025-898 (Metro Code 16.08.010.C / 16.08.014; mechanical amendments at 16.16.230). Final passage July 15, 2025; signed July 16, 2025. Chapter 11 amendments: the 2024 insulation/U-factor tables are replaced with the 2009 IRC tables; N1102.5.1.2 air leakage testing is replaced with the 2009 testing/visual inspection option; N1103.5.2 is rewritten.

Source

Energy code

2024 IECC as amended (Metro Code 16.08.016): 'The 2024 Edition of the International Energy Conservation Code is hereby amended so that it meets and does not exceed the 2018 International Energy Conservation Code standards as adopted by the State of Tennessee, per Tenn. Comp. R. & Regs. 0780-02-23-.02(1)(b).' Residential work also falls under the amended 2024 IRC Chapter 11.

Source

Load calculation (Manual J / S)

Required

2024 IRC M1401.3 is kept. The BL2025-898 mechanical amendments to the IRC (16.16.230) add M1203, M1601.1.1(9), M1601.3(1), M1901.3, amend the M1601.4.1 exception, and amend fuel-gas sections. They do not amend M1401.3, which requires sizing per ACCA Manual S based on loads per ACCA Manual J 'or other approved' methodologies.

Source

Duct design (Manual D)

Required

2024 IRC M1601.1 is not amended (Manual D, the manufacturer's instructions, or other approved methods). Metro adds M1601.1.1(9): 'All ductwork installed in non-conditioned and not completely conditioned areas such as, but not limited to, crawl, attic and floor/ceiling assemblies shall be insulated.' It also bans spray polyurethane foam on exterior ducts (M1601.3(1)).

Source

Equipment replacements (changeouts)

Metro's permit-required list for 1- and 2-family dwellings: 'AIR CONDITIONING-NEW & REPLACEMENT UNIT' = YES-G/M (gas/mechanical permit); 'FURNACE CONDENSER REPLACEMENT' = YES-G/M; 'FURNACE-REPLACE WITH DIFFERENT SIZE OR FUEL' = YES-G/M; 'HEATING SYSTEM-CHANGING SIZE OR CHANGE OF FUEL' = YES-G/M; 'FURNACE OR CONDENSER REPAIR' = NO. The list does not say whether a load calculation is required for a replacement.

Source

Energy compliance paths

Not verified for residential. Metro's residential permit page mentions field inspections for 'Model Energy Code' compliance. Metro's Drawing Requirements (Feb 2025, written under the 2018 codes and mainly commercial) says 'Energy compliance certificates shall be provided in the set as per 2018 IECC and www.energycodes.gov'.

Source

What the submittal asks for

Trade permits (plumbing, electrical, mechanical) are applied for or self-issued in ePermits by registered licensed contractors. Credentials are obtained by emailing Metro Codes. Residential building permits need a site plan and floor plans; 'Construction plans are required for residences exceeding 5,000 square feet'. No Metro checklist found that asks for Manual J/S/D or heat loss/gain with a gas/mechanical permit.

Source

Upcoming code changes

None found. At adoption Metro announced a 180-day grace period for projects with preliminary designs completed under the 2018 codes (news release; adopted July 2025, so the window has presumably passed).

Source
Verified against official sources on 2026-09-18. Codes and local policies change, so confirm with the building department before you submit. Send us the address and we will check it for you.

Questions

Does Nashville-Davidson, TN require a Manual J?

Yes. 2024 IRC M1401.3 is kept. The BL2025-898 mechanical amendments to the IRC (16.16.230) add M1203, M1601.1.1(9), M1601.3(1), M1901.3, amend the M1601.4.1 exception, and amend fuel-gas sections. They do not amend M1401.3, which requires sizing per ACCA Manual S based on loads per ACCA Manual J 'or other approved' methodologies.

What code does Nashville-Davidson, TN use?

2024 IRC with Metro amendments, BL2025-898 (Metro Code 16.08.010.C / 16.08.014; mechanical amendments at 16.16.230). Final passage July 15, 2025; signed July 16, 2025. Chapter 11 amendments: the 2024 insulation/U-factor tables are replaced with the 2009 IRC tables; N1102.5.1.2 air leakage testing is replaced with the 2009 testing/visual inspection option; N1103.5.2 is rewritten.

Same-day quotes

Drop the plans. Get a quote today.

Drop in the plan set and pick your services. A designer replies with price and turnaround, usually within 30 minutes during business hours.

Fast quote

Drop your plans. Get a quote.

PDF or photos of the plan set. Pick your services and send. A designer replies with price and turnaround.

    Services
    Price$0

      A designer reviews every plan set and replies with price and turnaround, usually within 30 minutes during business hours. Nothing is charged until you approve.